Our Projects
Rising To The Challenge

SILO/ BATCH HOPPER
OCT 29, 2018
Magnetic Particle Inspection
Plentong, Masai, Johor DT

CHIMNEY
DEC 12, 2018
Magnetic Particle Inspection
Plentong, Masai, Johor DT.

GUIDE HILL STATION
OCT 17, 2019
Magnetic Particle Inspection
Gelang Patah, Johor DT.
Client Quantum Sdn Bhd

LINKAGE BRIDGE COLUMN
FEB 12, 2020
Magnetic Particle Inspection
Dye Penetrant Inspection
​
Senai, Johor DT.

TRAINING AND CERTIFICATION ASNT SNT-TC-1A DYE PENETRANT INSPECTION
​
MAY 11, 2020
Special request during PKP approved by MITI in AsiaFlex-TechnipFMC.
Tg Langsat, Johor DT.

LINKAGE BRIDGE FRAME
JULY 17, 2020
Magnetic Particle Inspection
Senai, Johor DT.
​

SILO/ BATCH HOPPER
OCT 29, 2018
Magnetic Particle Inspection
Plentong, Masai, Johor DT

Ultrasonic Testing Thickness Measurement (UTTM)
Sept 25, 2020
In-House Training & Qualification for NDT method of Ultrasonic Testing Thickness Measurement (UTTM) and development of Written Practice as per SNT-TC-1A required by Client Prescott.

RADIOGRAPHIC INTERPRETATION
Oct 20, 2022
In-House Training for NDT method of Radiographic Interpretation (RI) as per Written Practice SNT-TC-1A JPSM.

RADIOGRAPHIC INTERPRETATION
Dec 29, 2022
In-House Training for NDT method of Radiographic Interpretation (RI) as per Written Practice SNT-TC-1A AFIGS.

ULTRASONIC TESTING LEVEL II (WELDS)
Aug 04, 2023
In-House Training for NDT method of Ultrasonic Testing Level II (Welds) as per Written Practice SNT-TC-1A JPSM.

WIM MULTI MIG350 SUPPLIED - 6 UNITS
Dec 15, 2023
WIM Multi MIG350 welding machine supplied and installed for 6 units to Johor Skills.

FLAWED SPECIMEN WITH LAMINATION FOR UTTG
Feb 08, 2024
Flawed specimen with lamination purpose for training or mock up test delivered to our client GTEC.